Fee Schedules
Fee Schedule Minimums
Minimum fees for Building Permits (including Swimming pools, roofs, siding, windows, insulation, doors, sheds, etc.) are $70 plus a 4% technology fee.
Minimum fees for Electrical, Plumbing, and Gas are as follows:
- Residential jobs requiring one inspection: $60 plus 4% technology fee.
- Residential jobs requiring two inspections: $100 plus 4% technology fee.
- Residential jobs requiring three inspections: $150 plus 4% technology fee.
- Commercial jobs: minimum fee is $150 plus 4% technology fee
These fees include all Building permits, Swimming Pool permits, Shed permits, Sheet Metal permits, Mechanical permits, Demolition permits, Mass Save Insulation permits, Roofing, Windows, Siding, and Door permits:
PROPERTY TYPE | TYPE OF WORK | RATE |
Residential | New construction, additions, alterations | $12/$1,000 total cost of construction plus 4% technology fee |
Residential | Minimum Fee | $70 plus 4% technology fee |
Commercial | New construction, additions, alterations | $12/$1,000 total cost of construction plus 4% technology fee |
Commercial | Minimum | $100 plus 4% technology fee |
Please note that separate gas and plumbing permits are required for gas fueled fixtures like water heaters, boilers, etc. If only one permit application is submitted without the other, the permit submitted will not be approved until its' accompanying permit is pulled.
PROPERTY TYPE | TYPE OF WORK | RATE |
Residential | New construction, additions, alterations | $80 plus $15 per fixture plus 4% technology fee |
Residential | Single Fixture | $60 plus 4% technology fee |
Commercial | New construction, additions, alterations | $150 plus $10 per fixture plus 4% technology fee |
Commercial | Single Fixture | $150 plus 4% technology fee |
PROPERTY TYPE | TYPE OF WORK | RATE |
Residential | New construction, additions, alterations | $20/$1,000 of total cost of electrical labor and materials plus 4% technology fee |
Residential | Single Fixture | $60 plus 4% technology fee |
Residential | Solar | $150 plus 4% technology fee |
Commercial | New construction, additions, alterations | $20/$1,000 of total cost of electrical labor and materials plus 4% technology fee |
Commercial | Single Fixture | $150 plus 4% technology fee |
Commercial | Solar | $20/$1,000 of total cost of electrical labor and materials plus 4% technology fee |